SecProbe.io

Filing text and metadata
Intelligence Terminal Search Probe Scores Topics IPO Watchlist Monthly Activity About API

SEC Company Response from CAPITAL GOLD CORP (CIK 0000726845) — Apr 28, 2005

CAPITAL GOLD CORP (CIK 0000726845)
Date: April 28, 2005 · CIK: 0000726845 · Accession: 0001144204-05-013154

AI Filing Summary & Sentiment

File numbers found in text: 333-123216

Date
April 8, 2005
Author
CORPORATION
Form
CORRESP
Company
CAPITAL GOLD CORP (CIK 0000726845)

Letter

Division of Corporate Finance, Stop 0405 SECURITIES AND EXCHANGE COMMISSION 5th St., NW Washington, DC 20549-0405 Re: Capital Gold Corporation Registration Statement on Form SB-2; SEC File No. 333-123216

Dear Mr. Baer:

Pursuant to comment No. 5 (Engineering Comments) in the April 8, 2005 comment letter from the Securities and Exchange Commission to Capital Gold Corporation (the “Company”), I am delivering, on a supplemental basis, the August 8, 2003 El Chanate Gold Mine Feasibility Study prepared by M3 Engineering of Tucson, Arizona (the “Feasibility Study”). As we discussed, the Feasibility Study is contained on the enclosed CD-ROM.

There are three volumes to the Feasibility Study included on the CD-ROM as follows:

Volume I: Executive Summary

Volume II (Appendices): Geology and Mining

Volume II: Geology and Mining

Volume III: Process, Infrastructure and Financials

In addition to the CD-ROM, I am enclosing four folded table size maps and a printed version of the Executive Summary. The enclosed maps are:

General location map scale 1:30,000

Topography & property map scale 1:50,000

Drill hole location map 1:2,500 scale; and

Drill hole gold grade map scale 1:2,500

To assist you in your review of the Feasibility Study, please note that information with regard to the bullet points in comment No. 5 can be found on the following pages of the Feasibility Study:

Comment

Volume;Chapter;Page Nos.

Property and geologic maps

Vol I; pg 10; also see maps folded separately

Description of your sampling and assaying procedures

Vol II; Ch 3; pg 16

Drill-hole maps showing drill intercepts

Vol II; Figures 3-2, 3-20, 3-21, 3-22,and see folded map.

Representative geologic cross-sections and drill logs

Vol II; Figures 3-25, 3-26, 3-27, and see drill logs on CD-ROM

Description and examples of your cut-off calculation procedures

Vol II; Ch 4; pg 3

Cutoffs used for each category of reserve and any resources

Vol II; Ch 4; pgs 2 & 3

Justifications for the drill hole spacings used at various classification levels

Vol II; Ch 3; pgs 14, 50-52

A detailed description of our procedures for estimating “reserves” and “resources,” if developed

Vol II; Ch 3; pgs 4 -72

Copies of pertinent engineering and geological reports, and feasibility studies or mine plans (including cashflow analyses) concerning your property that are needed to establish the existence of reserves as defined in Industry Guide 7

Vol II; Ch 4; pgs 1-32

& Vol III; Ch 15; pgs 1-7

Independent Mining Consultants in Tucson, Arizona determined the reserves and resources and you should feel free to contact:

Mr. Herb Welhener

Vice President and Principal Mining Engineer

Independent Mining Consultants, Inc.

2700 E. Executive Drive, Suite

Tucson, AZ 85706

Phone: (520) 294-9864

Fax: (520) 294-9865

If you have any questions or need additional information, please do not hesitate to call me at (303) 526-5100.

Very
truly yours,
CAPITAL GOLD
CORPORATION

Show Raw Text
CORRESP
1
filename1.htm

Unassociated Document

April 28,
2005

Mr. Roger
Baer

Mining
Engineer

Division
of Corporate Finance, Stop 0405

SECURITIES
AND EXCHANGE COMMISSION

450
5th St.,
NW

Washington,
DC 20549-0405

Re:
Capital
Gold Corporation Registration Statement on Form
SB-2; SEC File No. 333-123216

Dear Mr.
Baer:

Pursuant
to comment No. 5 (Engineering Comments) in the April 8, 2005 comment letter from
the Securities and Exchange Commission to Capital Gold Corporation (the
“Company”), I am delivering, on a supplemental basis, the August 8, 2003 El
Chanate Gold Mine Feasibility Study prepared by M3 Engineering of Tucson,
Arizona (the “Feasibility Study”). As we discussed, the Feasibility Study is
contained on the enclosed CD-ROM.

There are
three volumes to the Feasibility Study included on the CD-ROM as
follows:

    Volume I: Executive Summary

    Volume II (Appendices): Geology and
      Mining

    Volume II: Geology and Mining

    Volume III: Process, Infrastructure and
      Financials

 In
addition to the CD-ROM, I am enclosing four folded table size maps and a printed
version of the Executive Summary. The enclosed maps are:

      General
      location map scale 1:30,000

    Topography & property map scale 1:50,000

    Drill hole location map 1:2,500 scale; and

    Drill hole gold grade map scale 1:2,500

To assist
you in your review of the Feasibility Study, please note that information with
regard to the bullet points in comment No. 5 can be found on the following pages
of the Feasibility Study:

     Comment

    Volume;Chapter;Page
      Nos.

      Property
      and geologic maps

      Vol
      I; pg 10; also see maps folded separately

      Description
      of your sampling and assaying procedures

      Vol
      II; Ch 3; pg 16

      Drill-hole
      maps showing drill intercepts

      Vol
      II; Figures 3-2, 3-20, 3-21, 3-22,and see folded map.

      Representative
      geologic cross-sections and drill logs

      Vol
      II; Figures 3-25, 3-26, 3-27, and see drill logs on
  CD-ROM

      Description
      and examples of your cut-off calculation procedures

      Vol
      II; Ch 4; pg 3

      Cutoffs
      used for each category of reserve and any resources

      Vol
      II; Ch 4; pgs 2 & 3

      Justifications
      for the drill hole spacings used at various classification
      levels

      Vol
      II; Ch 3; pgs 14, 50-52

      A
      detailed description of our procedures for estimating “reserves” and
      “resources,” if developed

      Vol
      II; Ch 3; pgs 4 -72

      Copies
      of pertinent engineering and geological reports, and feasibility studies
      or mine plans (including cashflow analyses) concerning your property that
      are needed to establish the existence of reserves as defined in Industry
      Guide 7

      Vol
      II; Ch 4; pgs 1-32

      &
      Vol
      III; Ch 15; pgs 1-7

Independent
Mining Consultants in Tucson, Arizona determined the reserves and resources and
you should feel free to contact:

      Mr.
      Herb Welhener

    Vice President and Principal Mining Engineer

    Independent Mining Consultants,
  Inc.

    2700 E. Executive Drive, Suite
  140

    Tucson, AZ 85706

    Phone: (520) 294-9864

    Fax: (520)
294-9865

If you
have any questions or need additional information, please do not hesitate to
call me at (303) 526-5100.

Very
truly yours,

    CAPITAL GOLD
      CORPORATION

    /s/ Roger A.
      Newell

      Roger A. Newell, Ph.D.

    Vice-President of
      Development

      Enclosures