SEC Comment Letter 0000000000-23-010088 to HALLADOR ENERGY CO (HNRG)
HALLADOR ENERGY CO
Date: Sept. 12, 2023 · CIK: 0000788965 · Accession: 0000000000-23-010088
AI Filing Summary & Sentiment
File numbers found in text: 001-34743
Show Raw Text
United States securities and exchange commission logo
September 12, 2023
Lawrence Martin
Chief Financial Officer
Hallador Energy Company
1183 East Canvasback Drive
Terre Haute, Indiana 47802
Re:Hallador Energy Company
Form 10-K for the Fiscal Year ended December 31, 2022
Filed March 16, 2023
File No. 001-34743
Dear Lawrence Martin:
We have reviewed your September 6, 2023 response to our comment letter and have the
following comments. In some of our comments, we may ask you to provide us with information
so we may better understand your disclosure.
Please respond to these comments within ten business days by providing the requested
information or advise us as soon as possible when you will respond. If you do not believe our
comments apply to your facts and circumstances, please tell us why in your response.
After reviewing your response to these comments, we may have additional
comments. Unless we note otherwise, our references to prior comments are to comments in our
August 1 2023 letter.
Form 10-K for the Fiscal Year ended December 31, 2022
Mining Properties, page 31
1.We understand from your response to prior comments 1 through 5 that you would prefer
to limit compliance with the various disclosure requirements referenced in those
comments to future filings.
However, considering the scope of this missing content we continue to believe that you
will need to file an amendment to provide all of the required disclosures. We suggest that
you submit a draft of all revisions for review prior to filing your amendment.
We reissue prior comment 1 through 5.
FirstName LastNameLawrence Martin
Comapany NameHallador Energy Company
September 12, 2023 Page 2
FirstName LastNameLawrence Martin
Hallador Energy Company
September 12, 2023
Page 2
Exhibits and Financial Statement Schedules, page 72
2.We note your response to prior comments 6 and 7, indicating that you intend to rely on the
2021 Technical Report Summary prepared by Boyd for the Oaktown Mining Complex,
and that you believe the report includes all of the required information.
However, we have reviewed the various sections of the report referenced in your response
and continue to believe that you will need to obtain and file a revised Technical Report
Summary to address the following requirements.
•Item 601(b)(96)(iii)(B)(12)(iii) of Regulation S-K requires information about the
price and cut-off grade, which should be included in the Coal Resources and
Reserves section of the report. The qualified person should provide a detailed
explanation about why he believes the particular price is appropriate; and if relying
on a quality cut-off rather than a cut-off grade, should also provide the quality
specifications and a clear explanation of the minimum quality parameters.
•Item 601(b)(96)(iii)(B)(16)(i) of Regulation S-K requires information about product
markets and price projections which should be presented in the Market Analysis
section of the report.
•Item 601(b)(96)(iii)(B)(17) of Regulation S-K requires information about certain
environmental and permitting factors, which should be presented in the Permitting
and Compliance section of the report.
•Item 601(b)(96)(iii)(B)(19)(i) of Regulation S-K requires taxes to be considered in
the economic analysis from the standpoint of the issuer notwithstanding the
operating company status as a pass-through entity.
The revised Technical Report Summary should be attached as an exhibit to the annual
report and listed in the exhibit index. We suggest that you submit a draft of the revised
report for our review prior to filing your amendment.
3.We understand from your response to prior comment 8 that coal associated with various
uncontrolled tracts that you expect to acquire in the future, i.e. materials not classified as a
mineral reserve, have been included in your life-of-mine plan and project economics.
Although you indicate the mineral rights to these parcels are expected to be acquired
"during the ordinary course of business," the quantities utilized in the life of mine plan
and project economics of a feasibility study or preliminary feasibility study, must be
limited to those in which you hold an ownership interest and which constitute a mineral
reserve, consistent with Item 1300 and 1302(e)(3) of Regulation S-K.
Please arrange to obtain and file a revised Technical Report Summary having a life-of-
mine plan and project economics that are consistent with these requirements.
FirstName LastNameLawrence Martin
Comapany NameHallador Energy Company
September 12, 2023 Page 3
FirstName LastName
Lawrence Martin
Hallador Energy Company
September 12, 2023
Page 3
You may contact John Coleman, Mining Engineer, at 202-551-3610 or Karl Hiller,
Branch Chief, at 202-551-3686 if you have questions regarding comments.
Sincerely,
Division of Corporation Finance
Office of Energy & Transportation