SecProbe.io

Filing text and metadata
Intelligence Terminal Search Probe Scores Topics IPO Watchlist Monthly Activity About API

SEC Company Response from DYNARESOURCE, INC. (DYNR) (CIK 0001111741) (DYNR) — Apr 24, 2019

DYNARESOURCE, INC. (DYNR) (CIK 0001111741)
Date: April 24, 2019 · CIK: 0001111741 · Accession: 0001121781-19-000032

AI Filing Summary & Sentiment

File numbers found in text: 000-30371

Date
December 31, 2017
Author
K.W. (“K.D.) Diepholz
Form
CORRESP
Company
DYNARESOURCE, INC. (DYNR) (CIK 0001111741)

Letter

DynaResource, Inc.

W. Las Colinas Blvd

Suite 1910 North Tower

Irving, Texas 75039

Office of Beverages, Apparel, and Mining

U. S. Securities and Exchange Commission

Division of Corporate Finance

F. Street, NE

Washington, DC 20549

Re: DynaResource, Inc.

Form 10-K for Fiscal Year Ended December 31, 2017

Filed April 16, 2018

File No. 000-30371

Ladies and Gentlemen:

This letter is in response to your oral comments on the above captured filing on February 25, 2019.

Those comments were issued during a conference call between SEC support staff and DynaResource, Inc. management as a follow up to our January 10, 2019 response to your December 18, 2018 letter.

Form 10-K for Fiscal Year Ended December 31, 2017

Notes to Consolidated Financial Statements

Note 1. Nature of Activities and Significant Accounting Policies

Property

Design, Construction and Development Costs, page 57

1. We have reviewed your response to comment 1 noting you do not believe the costs you capitalized for the medical facility, camp, office infrastructure improvements, tailings pond and liner improvements, new foundation for the Denver Mill, installation cost for Mill #3, other machinery and equipment and transportation equipment related to mine development. Considering you have not established proven and probable reserves for this mine and you continue to be in the exploration stage, please provide us with a detailed discussion of how you determined the probably future economic benefit for each of these capitalized costs, including: (a) your expected proceeds and associated costs from alternative future uses for each of these capitalize costs and (b) the salvage value for each of these capitalized amounts. Also tell us the basis for each of your material assumptions, including providing supporting evidence.

Response:

Because the DynaResource mining operations has only one source of revenue, the sale of minerals primarily gold and silver, extracted and processed from the mining operations, it is impractical to perform a separate detailed analysis of the probable future economic benefit for each of the capitalized costs.

While we have not established “proven and probable reserves” under SEC Guide 7 (although the Company does report 402,000 “Indicated” Oz Au and 741,000 “Inferred” Oz Au under the definitions described in Canadian National Instrument 43-101) the Company has established a proven revenue stream from its mining operations. Total revenues for the year ended December 31, 2018 were approximately $14,000,000, which represented an increase of approximately 30% over 2017 revenues. Forecasted revenue for the year ending December 31, 2019 is $30,000,000. Our analysis of the future economic benefit of the capitalized costs is based on our 2017 and 2018 revenue and the additional revenue we expect to generate through the expansion of our mining and processing facilities in 2019 and in future years. All the capitalized costs in 2017 discussed in your comment as well as the additional cost incurred in 2018 are necessary to support and process the increased mining production.

None of the capitalizable items have significant expected proceeds from alternative uses or if salvaged. Therefore, neither were factors considered in our determination of the future economic benefit of the assets.

The Company’s mining operations are in the Construction phase, and these assets qualify as construction assets as defined by Guide 7. Construction assets and facilities are infrastructure, building, machinery, plant and equipment necessary to extract, treat, and transport material from the mineral reserve. Per Guide 7, construction assets have a separate measurable life which may be longer or shorter than the measurable life of the mine.

Request:

The specific oral request was for the Company to provide a detail five-year projection of revenue and expenses from mining operations to document that we believe we will generate enough cash flow to recover our investment in the construction assets as defined above.

Response:

In response to this request we submit the attached three exhibits:

Exhibit A. – A five-year projected statement of operations compiled with the same format as the Company’s Form 10K statement of operations.

Exhibit B. – A five-year operating projection for the mining operations including detailed calculations of projected revenue, mining and production costs.

Exhibit C - A comparison between actual yield during the test mining phase and the projected yield as defined in the block model NI 43-101 report.

Key assumptions in the projection are as follows:

Revenue: Increase in daily mine production from 200 tonnes per day in April 2019 to 320 tonnes per day beginning in January 2020 and continuing through December 2023. Increase in daily plant processing from 190 tones per day in April 2019 to 310 tonnes per day beginning in January 2020 with an average feed grade of 11.50 g/t. This increase in production is based on opening additional mines (Tres Amigos), by July 2020. The increase in processing capacity is based on the completion of the rehabilitation of the third mill. Revenue is calculated based on a $1,250 an ounce gold price reduced by the buyer’s discount and processing costs based on the terms of the current sales contract.

Production Cost Applicable to Sales: Plant processing costs are estimated at $45 a ton consistent with historical processing costs.

Mine Production Cost Costs of mining ore for processing is estimated at $60 a ton based on historical costs.

Mine Exploration Costs: Costs of mining the waste materials necessary to reach the mineral deposits is the same as the mining the materials for production at $60 a ton. The ratio of waste material to production material was estimated by the mining team. It is higher in 2019 reflective of the cost of commencing the opening of the first Tres Amigos mine.

Transportation Costs: Transportation cost are estimated at 4.5% of revenue based on historical costs.

Camp, Warehouse and Facility Costs: Mining support costs reflect only a slight increase over 2018 cost. That facilities in place were constructed and staffed to support the projected level of production.

Property Holding Costs: Property holdings cost reflect the reductions of the Company’s mining concessions in 2018 from 69,121 hectares to 9,920 hectares.

General and Administrative Costs: - G&A expenses are projected to remain flat over the next five years.

Depreciation & Amortization - Depreciation expense is projected based on depreciation of current assets plus projected additions.

Non-Operating Costs The only non-operating cost include in the projection was interest expense which was calculated based on amortization of current notes with the assumption the convertible notes payable would be paid off from cash flow in 2020. No attempt was made to estimate the effect of foreign currency exchange gains and losses.

Based on this projection, Company management feels that the cash flow provided from mining operations will be sufficient to recover the Company’s investment in the construction assets and that the assets are properly accounted for in the Company’s financial statements.

The Company acknowledges that the Company and its management are responsible for the adequacy and accuracy of the disclosure in the filing, notwithstanding any review, comments, action or absence of action by the staff of the Commission.

Respectfully,
/s/
K.W. (“K.D.) Diepholz

Show Raw Text
CORRESP
1
filename1.htm

DynaResource, Inc.

222
W. Las Colinas Blvd

Suite
1910 North Tower

Irving,
Texas 75039

Office
of Beverages, Apparel, and Mining

U.
S. Securities and Exchange Commission

Division
of Corporate Finance

100
F. Street, NE

Washington,
DC 20549

Re:	               DynaResource,
Inc.

Form
10-K for Fiscal Year Ended December 31, 2017

Filed
April 16, 2018

File
No. 000-30371

Ladies
and Gentlemen:

This
letter is in response to your oral comments on the above captured filing on February 25, 2019.

Those
comments were issued during a conference call between SEC support staff and DynaResource, Inc. management as a follow up to our
January 10, 2019 response to your December 18, 2018 letter.

Form
10-K for Fiscal Year Ended December 31, 2017

Notes
to Consolidated Financial Statements

Note
1. Nature of Activities and Significant Accounting Policies

Property

Design,
Construction and Development Costs, page 57

 1. We
                                         have reviewed your response to comment 1 noting you do not believe the costs you capitalized
                                         for the medical facility, camp, office infrastructure improvements, tailings pond and
                                         liner improvements, new foundation for the Denver Mill, installation cost for Mill #3,
                                         other machinery and equipment and transportation equipment related to mine development.
                                         Considering you have not established proven and probable reserves for this mine and you
                                         continue to be in the exploration stage, please provide us with a detailed discussion
                                         of how you determined the probably future economic benefit for each of these capitalized
                                         costs, including: (a) your expected proceeds and associated costs from alternative future
                                         uses for each of these capitalize costs and (b) the salvage value for each of these capitalized
                                         amounts. Also tell us the basis for each of your material assumptions, including providing
                                         supporting evidence.

Response:

Because
the DynaResource mining operations has only one source of revenue, the sale of minerals primarily gold and silver, extracted and
processed from the mining operations, it is impractical to perform a separate detailed analysis of the probable future economic
benefit for each of the capitalized costs.

While
we have not established “proven and probable reserves” under SEC Guide 7 (although the Company does report 402,000
“Indicated” Oz Au and 741,000 “Inferred” Oz Au under the definitions described in Canadian National Instrument
43-101) the Company has established a proven revenue stream from its mining operations. Total revenues for the year ended December
31, 2018 were approximately $14,000,000, which represented an increase of approximately 30% over 2017 revenues. Forecasted revenue
for the year ending December 31, 2019 is $30,000,000. Our analysis of the future economic benefit of the capitalized costs is
based on our 2017 and 2018 revenue and the additional revenue we expect to generate through the expansion of our mining and processing
facilities in 2019 and in future years. All the capitalized costs in 2017 discussed in your comment as well as the additional
cost incurred in 2018 are necessary to support and process the increased mining production.

None
of the capitalizable items have significant expected proceeds from alternative uses or if salvaged. Therefore, neither were factors
considered in our determination of the future economic benefit of the assets.

The
Company’s mining operations are in the Construction phase, and these assets qualify as construction assets as defined by
Guide 7. Construction assets and facilities are infrastructure, building, machinery, plant and equipment necessary to extract,
treat, and transport material from the mineral reserve. Per Guide 7, construction assets have a separate measurable life which
may be longer or shorter than the measurable life of the mine.

Request:

The
specific oral request was for the Company to provide a detail five-year projection of revenue and expenses from mining operations
to document that we believe we will generate enough cash flow to recover our investment in the construction assets as defined
above.

Response:

In
response to this request we submit the attached three exhibits:

Exhibit
A. – A five-year projected statement of operations compiled with the same format as the Company’s Form 10K statement
of operations.

Exhibit
B. – A five-year operating projection for the mining operations including detailed calculations of projected revenue, mining
and production costs.

Exhibit
C - A comparison between actual yield during the test mining phase and the projected yield as defined in the block model NI 43-101
report.

Key
assumptions in the projection are as follows:

Revenue:
Increase in daily mine production from 200 tonnes per day in April 2019 to 320 tonnes per day beginning in January 2020 and continuing
through December 2023. Increase in daily plant processing from 190 tones per day in April 2019 to 310 tonnes per day beginning
in January 2020 with an average feed grade of 11.50 g/t. This increase in production is based on opening additional mines (Tres
Amigos), by July 2020. The increase in processing capacity is based on the completion of the rehabilitation of the third mill.
Revenue is calculated based on a $1,250 an ounce gold price reduced by the buyer’s discount and processing costs based on
the terms of the current sales contract.

Production
Cost Applicable to Sales: Plant processing costs are estimated at $45 a ton consistent with historical processing costs.

Mine
Production Cost  Costs of mining ore for processing is estimated at $60 a ton based on historical costs.

Mine
Exploration Costs: Costs of mining the waste materials necessary to reach the mineral deposits is the same as the mining the
materials for production at $60 a ton. The ratio of waste material to production material was estimated by the mining team. It
is higher in 2019 reflective of the cost of commencing the opening of the first Tres Amigos mine.

Transportation
Costs: Transportation cost are estimated at 4.5% of revenue based on historical costs.

Camp,
Warehouse and Facility Costs: Mining support costs reflect only a slight increase over 2018 cost. That facilities in place
were constructed and staffed to support the projected level of production.

Property
Holding Costs: Property holdings cost reflect the reductions of the Company’s mining concessions in 2018 from 69,121
hectares to 9,920 hectares.

General
and Administrative Costs: - G&A expenses are projected to remain flat over the next five years.

Depreciation
& Amortization  - Depreciation expense is projected based on depreciation of current assets plus projected additions.

Non-Operating
Costs The only non-operating cost include in the projection was interest expense which was calculated based on amortization
of current notes with the assumption the convertible notes payable would be paid off from cash flow in 2020. No attempt was made
to estimate the effect of foreign currency exchange gains and losses.

Based
on this projection, Company management feels that the cash flow provided from mining operations will be sufficient to recover
the Company’s investment in the construction assets and that the assets are properly accounted for in the Company’s
financial statements.

The
Company acknowledges that the Company and its management are responsible for the adequacy and accuracy of the disclosure in the
filing, notwithstanding any review, comments, action or absence of action by the staff of the Commission.

Respectfully,

/s/
K.W. (“K.D.) Diepholz

Chairman
/ CEO

    DYNARESOURCE,
    INC.

    EXHIBIT
    A - FIVE YEAR PROJECTION

     Year

     Year

     Year

     Year

     Year

     Five
    Year

     2019

     2020

     2021

     2022

     2023

     Total

    REVENUE

             22,650,063

    $
             35,984,600

    $
             35,984,600

    $
             35,984,600

    $
             35,984,600

    $
           166,588,463

    COSTS
    AND EXPENSES OF MINING OPERATIONS

    Production
    Cost Applicable to Sales

               3,245,791

               4,743,000

               4,743,000

               4,743,000

               4,743,000

             22,217,791

    Mine Production
    Costs

               5,162,741

               6,528,000

               6,528,000

               6,528,000

               6,528,000

             31,274,741

    Mine Exploration
    Costs

               3,757,537

               5,222,400

               5,222,400

               5,222,400

               5,222,400

             24,647,137

    Camp,
    Warehouse and Facilities

               2,921,774

               3,000,000

               3,000,000

               3,000,000

               3,000,000

             14,921,774

    Transportation

               1,165,249

               1,620,000

               1,620,000

               1,620,000

               1,620,000

               7,645,249

    Property
    Holding Costs

                 250,000

                 250,000

                 250,000

                 250,000

                 250,000

               1,250,000

    General
    and Administrative

               2,433,157

               2,400,000

               2,400,000

               2,400,000

               2,400,000

             12,033,157

    Depreciation
    and Amortization

                 299,180

                 300,000

                 300,000

                 300,000

                 300,000

               1,499,180

    Total
    Operating Expenses

             19,235,429

             24,063,400

             24,063,400

             24,063,400

             24,063,400

           115,489,029

    NET OPERATING
    INCOME

               3,414,635

             11,921,200

             11,921,200

             11,921,200

             11,921,200

             51,099,435

    OTHER
    INCOME (EXPENSE)

    Foreign
    Currency Gains (Losses)

                          -

                          -

                          -

                          -

                          -

                          -

    Interest
    Expense

                (470,000)

                (304,000)

                  (38,000)

                          -

                          -

                (812,000)

    Derivatives
    Mark-to-Market Gain (Loss)

                          -

                          -

                          -

                          -

                          -

                          -

    Other
    Income (Expense)

                          -

                          -

                          -

                          -

                          -

    Total
    Other Income (Expense)

                (470,000)

                (304,000)

                  (38,000)

                          -

                          -

                (812,000)

    NET INCOME  BEFORE
    TAXES

               2,944,635

             11,617,200

             11,883,200

             11,921,200

             11,921,200

             50,287,435

    TAXES

                          -

                          -

                          -

                          -

                          -

                          -

    NET INCOME

               2,944,635

    $
             11,617,200

    $
             11,883,200

    $
             11,921,200

    $
             11,921,200

    $
             50,287,435

    Exhibit
    B

    5
    Year Summary - Underground Mining

    San
    Pablo, San Pablo East, Tres Amigos, San Pablo South

    Mine

    Mine
    (Ore Tons)
    500,000

    Mine
    (Ore g/t)
    12.41

    Mined
    Gold Oz
    199,493

    Plant

    Ore
    Feed (Tons)

    483,700

    Ore
    Feed (g/t)

    11.41

    Gold
    Oz

    177,461

    Recovery

    85%

    Gross
    Recovered Gold Oz
    150,841

    Non
    Recovered Gold Ozs Deposited to Tailings

       Estimate
    Recoverability of 50% - 75%
    26,620

    Revenue
    / Cost

    Gross
    Revenue

    $188,551,250

    Net
    Revenue

    $164,258,900

    Total
    Operating Cost
    $105,049,000

    Other
    Cost

    $4,200,000

    Net
    Operating Profit

    $55,009,900

    Operating
    Costs / Per Gold Oz
    $696

    All
    Inclusive Cost / Per Gold Oz
    $728

    Case
    Gold
    Price ($US / Oz)
    Operating
    Cash

    Million
    USD

    Base
    Case
    $1,200
    $58.5

    Base
    Case
    $1,250
    $65.7

    Base
    Case
    $1,300
    $72.8

    Base
    Case
    $1,500
    $101.4

    San
    Jose de Gracia Underground Gold Mines

    San
    Jose de Gracia Underground Gold Mines

    15
    Month Projections  (April, 2019 - June 2020)

    15
    Month Projections (April, 2019 - June 2020)  Page 2

    Apr-2019
    May-2019
    Jun-2019
    Jul-2019
    Aug-2019
    Sep-2019
    Oct-2019
    Nov-2019
    Dec-2019
    Jan-2020
    Feb-2020
    Mar-2020
    April,
    2020
    May
    2020
    June
    2020
    Total

    Operating
    Days
    30
    30
    30
    30
    30
    30
    30
    30
    30
    30
    30
    30
    30
    30
    30
    450

    Mine

    Ore
    Tons Mined / Day
                              200
                              200
                               200
                               260
                               260
                              260
                               260
                               260
                               260
                               320
                               320
                               320
                               320
                               320
                               320
                                  272

    Ore
    Tons / Mined
                          6,000
                          6,000
                           6,000
                           7,800
                           7,800
                          7,800
                           7,800
                           7,800
                           7,800
                           9,600
                           9,600
                           9,600
                           9,600
                           9,600
                           9,600
                          122,400

    Gold
    Grade (g/t)
                          10.00
                          10.00
                           10.00
                           12.50
                           12.50
                          12.50
                           12.50
                           12.50
                           12.50
                           12.50
                           12.50
                           12.50
                           12.50
                           12.50
                           12.50
                               12.13

    Gold
    Oz
                          1,929
                          1,929
                           1,929
                           3,135
                           3,135
                          3,135
                           3,135
                           3,135
                           3,135
                           3,858
                           3,858
                           3,858
                           3,858
                           3,858
                           3,858
                            47,745

    Waste
    tons
                          4,800
                          4,8