SEC Company Response from FORTUNE OIL & GAS INC (CIK 0001119949) — Oct 26, 2005

FORTUNE OIL & GAS INC (CIK 0001119949)
Date: Oct. 26, 2005 · CIK: 0001119949 · Accession: 0001144204-05-032689

AI Filing Summary & Sentiment

Referenced dates: September 2, 2005

Date
October 26, 2005
Author
Jennifer A. Post, Esq.
Form
CORRESP
Company
FORTUNE OIL & GAS INC (CIK 0001119949)

Letter

October 26, 2005 Via EDGAR Transmission and Federal Express United States Securities and Exchange Commission Office of Corporation Finance 100 F Street, N.E. Washington, D.C. 20549 Attention: Mr. H. Christopher Owings, Assistant Director Ms. Anita Karu, Attorney Advisor

Re: Comment Letter dated September 2, 2005 File No. 0-52484 Fortune Oil & Gas, Inc. Registration Statement on Form 10, Amendment No. 1

Dear Mr. Owings:

On behalf of Fortune Oil & Gas, Inc. (the "Company"), we enclose as supplemental information certain "reserve reports" in connection with our previously filed response to Staff's comments, filed on October 18, 2005. The attached supplemental information is responsive to Staff comment number 29, reprinted below.

29. Please provide us with the reserve report by Petroleum Geo-Services.

In response to Staff Comments, we are attaching the reserve report to this Response Letter.

We hope that the information contained in this letter completes the information set forth in the Company's response letter of October 18, 2005. Please do not hesitate to contact the undersigned by telephone at (310) 208-1182, or by facsimile at (310) 208-1154 for further assistance.

Very truly yours,
RICHARDSON & PATEL LLP
By:
-----------------------
Jennifer A. Post, Esq.

Show Raw Text
<DOCUMENT>
<TYPE>CORRESP
<SEQUENCE>1
<FILENAME>filename1.txt
<TEXT>

                              RICHARDSON & PATEL, LLP
                        10900 Wilshire Boulevard, Suite 500
                           Los Angeles, California, 90024

                                  October 26, 2005

Via  EDGAR Transmission and Federal Express

United States Securities and Exchange Commission
Office of Corporation Finance
100 F Street, N.E.
Washington, D.C. 20549
Attention:  Mr. H. Christopher Owings, Assistant Director
            Ms. Anita Karu, Attorney Advisor

      Re:   Comment Letter dated September 2, 2005
            File No. 0-52484
            Fortune Oil & Gas, Inc.
            Registration Statement on Form 10, Amendment No. 1

Dear Mr. Owings:

      On behalf of Fortune Oil & Gas, Inc. (the "Company"), we enclose as
      supplemental information certain "reserve reports" in connection with our
      previously filed response to Staff's comments, filed on October 18, 2005.
      The attached supplemental information is responsive to Staff comment
      number 29, reprinted below.

      29. Please provide us with the reserve report by Petroleum Geo-Services.

      In response to Staff Comments, we are attaching the reserve report to this
      Response Letter.

      We hope that the information contained in this letter completes the
      information set forth in the Company's response letter of October 18,
      2005. Please do not hesitate to contact the undersigned by telephone at
      (310) 208-1182, or by facsimile at (310) 208-1154 for further assistance.

                                    Very truly yours,
                                    RICHARDSON & PATEL LLP

                                    By:
                                        -----------------------
                                        Jennifer A. Post, Esq.

Cc: Mr. James Wensveen

<PAGE>

The Directors
Fortune Oil & Gas Inc.
Suite # 305 - 1656 Martin Drive
White Rock, B.C.  V4A 6E7
CANADA

                                                                 18th March 2005

Dear Sirs,

           Re: Oil & Gas Reserves of the Camar Field, Offshore Indonesia

      At your request we have performed an independent assessment of the
      reserves of the Camar oilfield, offshore Indonesia. We have conducted the
      evaluation in accordance with accepted industry practice, based on
      information made available to PGS Reservoir Ltd ("PGS") during a visit to
      the offices of Indo-Pacific Resources (Java) Ltd in July 2004.

      A summary of the reserves assessment as at 31st December 1999 is presented
      below:

             ---------------------------------------------------------
             Reserves          Proved        Proved         Total
             Category:-       Developed    Undeveloped     Proved
                               mmbbls        mmbbls        mmbbls
             ---------------------------------------------------------
             Gross              1.104         0.000         1.104
             ---------------------------------------------------------
             Net to IPRJ        0.983         0.000         0.983
             ---------------------------------------------------------

      There are currently no gas reserves in the Camar field which can be
      admitted to the Proved category.

      The reserves have been estimated in accordance with the definition of
      Proved Reserves included within Rule 4-10(a) of Regulation S-X of the US
      Securities Exchange act of 1934.

<PAGE>

Professional Qualifications

      PGS Reservoir Limited is an independent consultancy specialising in
      petroleum reservoir evaluation and economic analysis. Except for the
      provision of professional services on a fee basis, PGS Reservoir Limited,
      does not have a commercial arrangement with any other person or company
      involved in the interests which are the subject of this letter.

Introduction

      In carrying out this evaluation PGS have relied upon information provided
      by Fortune Oil & Gas Inc., via its wholly owned subsidiary Indo-Pacific
      Resources (Java) Ltd. (IPRJ). This consisted of engineering and
      exploration data, technical reports, interpreted data, costs and
      commercial data. The interpreted data and technical reports all pre-date
      Fortune's involvement in the Bawean Production Sharing Contract area, in
      which the Camar field lies.

      In estimating the reserves, we have used the standard techniques of
      petroleum engineering. The Camar field is relatively mature, and
      performance extrapolation methods have primarily been used to estimate
      reserves.

      It should be noted that whilst the uncertainty in the estimate of ultimate
      recovery of a mature field tends to decrease with time, the uncertainty in
      the reserves tends to increase in the late stages of the field's life. The
      absolute magnitude of the uncertainties may be decreasing, but they
      represent an increasing proportion of what remains.

      Reserves definitions as they apply to the estimates disclosed in this
      letter are presented in Appendix 1.

<PAGE>

Camar Field

      The Camar field lies approximately 50 miles offshore the northern coast of
      eastern Java in the Bawean Production Sharing Contract Area. The discovery
      well, JS-1/1 was drilled in 1970 by Cities Service, and two appraisal
      wells were also drilled in the early 1970s. The discovery well tested
      1,200 b/d of oil from the upper Oligocene Kujung II carbonates, but the
      discovery was considered non-commercial at that time, and the contract
      area was relinquished.

      In 1981, Kerr-McGee were awarded the Bawean Production Sharing Contract
      Area, and between 1982 and 1985 they drilled three further Camar field
      appraisal wells. Texas Eastern then drilled another two wells in 1986,
      having taken over operatorship from Kerr-McGee. Texas Eastern prepared a
      development plan for Camar, but were bought by Enterprise Oil before it
      was implemented. The development was therefore undertaken by Enterprise,
      with six development wells being drilled in 1989- 1990, and first oil
      production occurring from the field in 1991.

      Field performance did not live up to the operator's expectations, and the
      field was shut-in during 1994, due to low reservoir pressure and
      increasing water production problems. The Bawean PSC area was then
      purchased by Carmanah Resources Limited, through a wholly owned subsidiary
      named GFB Resources (Java) Ltd. GFB undertook some additional development
      drilling, and added three more development wells during 1997 - 1998. The
      field was again shut-in during 1999.

      In May 2000 Fortune Oil & Gas Inc. acquired the Bawean PSC area through
      their wholly owned subsidiary Indo-Pacific Resources (Java) Ltd., and the
      Camar field was re-activated to commence production again in January 2001.
      The field was once again shut-in at the end of March 2004, and has
      remained so since then. At that time, four wells from a total of nine were
      still on production, with around eighty five percent of the total oil
      production coming from one well in the southern lobe.

      The Camar field is a twin-lobed structure trending North-East to
      South-West, and all the oil production is from the Kujung II (upper
      Oligocene) unit. This unit is a complex fractured carbonate at an average
      depth of about 3,800 feet, which is sub-divided into upper and lower
      intervals, both of which are capped by shales. Oil is present in the upper
      limestone interval (the Kujung II Upper zone), but the potential pay zones
      of these reservoirs are difficult to correlate and appear to be isolated
      from one another. This zone was tested in the Camar 6 well, but it had
      poor permeability.

      The principal productive zones in the Camar field are in the lower
      limestone interval of the Kujung II unit, which are subdivided into the
      Kujung II LL1, LL2, LL3, and LL4 zones, from youngest to oldest. The
      Kujung II unit is heterogeneous, and was deposited in a low-energy,
      carbonate shelf environment. Below the LL4 limestone is a clastic zone -
      the LL4 sandstone. This zone has proved reserves in the Camar 6 well over
      a limited area of the North-Eastern lobe.

<PAGE>

      The Kujung II reservoirs are cut by faults and fractures related to the
      underlying basement topography that increases original matrix permeability
      and improves flow into existing producing wells.

      Above the Kujung II unit lies the Kujung I unit, which is a massive,
      fractured, shallow marine limestone deposit at a depth of approximately
      2,700 feet. It conformably overlies the Kujung II carbonates, and is gas
      bearing, although the only production from this unit is gas for use in
      gas-lifting wells completed on the Kujung II.

      The producing mechanism for the field is a mixture of simple depletion and
      natural water influx. However, the natural water drive is not particularly
      strong, and reservoir pressures have dropped below the bubble point of the
      oil, leading to increased gas-oil ratios. Nevertheless, water is able to
      enter the wells via the fracture network, resulting in high producing
      water cuts in many of the wells. No secondary recovery projects have been
      implemented in the Camar field, and no fluids are injected into the
      reservoir.

      Camar oil is sweet, with an gravity of around 38(degree) API, and an
      initial solution gas-oil ratio of approximately 550 scf/bbl.

       The field producing infrastructure consists of three fixed structures,
       plus a floating storage vessel named the Fortuna Ayu. A central
       processing platform is located on the southern lobe of the field, and
       this platform processes all the field production and pipes the stabilized
       oil to the floating storage unit. The platform is unmanned; all
       production operations are controlled from the Fortuna Ayu.

       Two further structures are located in the northern lobe of the field,
       these being a wellhead production platform which is host to three
       production wells, and a monopod tower which is host to an additional two
       wells. Produced fluids from these two platforms are sent to the central
       processing platform via a 6" pipeline.

       Produced gas in excess of fuel requirements is flared.

       Camar is operated under a production sharing contract, which for this
       field has relatively straight-forward terms. There is no royalty,
       although there is a "First Tranche Provision" (FTP) which is a percentage
       of the gross production revenue that is shared directly with the
       government, before any cost recovery or profit oil is taken. The FTP is
       20 percent of the gross production revenue, and the contractor group is
       entitled to a 45.45 percent share of it. Allowable costs are recovered
       from the remaining 80 percent of the gross production, with any unused
       cost oil being shared with the government in the same proportions as the
       FTP.

       Because the field has historically not performed as well as the operator
       had predicted, there is a large un-recovered cost pool still associated
       with the Camar field, and consequently all the permitted cost oil
       allowance will revert to the contractor group. Indo-Pacific Resources
       (Java) Ltd therefore retains 89.09 percent of the proceeds of the crude
       sales. Sales are normally made to Pertamina for US dollars at the
       prevailing Indonesian crude price, which tends to approximate the price
       received for West Texas Intermediate.

<PAGE>

       Reserves for the Camar field have been estimated using extrapolations of
       existing performance trends, and the predicted profile has been truncated
       in the month when the gross revenue is exceeded by the field operating
       costs. The oil price used in the economic limit calculation is the
       average WTI price for the week in which the 31st December falls, and the
       fixed and variable operating costs have been estimated from copies of the
       financial reports submitted by Indo-Pacific Resources (Java) Ltd. to the
       Indonesian authorities.

       There are no further development activities or production enhancement
       projects in the future budgets which can be expected to arrest the
       decline trends observed in the historical production data, or result in
       any future reserve additions. If the field was shut-in prior to the
       year-end, it has been assumed that production would re-commence at the
       beginning of the new year.

       As of the 31st December 1999, the ultimate recovery and remaining
       reserves for the Camar field are estimated to be as follows:

                               Gross                         Net
                   Cumulative   Annual  Average Cumulative  Annual    Average
           Year    Production Production  Rate  Production Production   Rate
                      mmbbls   mmbbls    bbls/d    mmbbls   mmbbls     bbls/d
         31-Dec-99     9.467                       8.434
         31-Dec-00     9.969    0.502    1,372     8.882    0.447       1,222
         31-Dec-01    10.276    0.307      840     9.155    0.273         748
         31-Dec-02    10.464    0.188      514     9.322    0.167         458
         31-Dec-03    10.571    0.107      294     9.418    0.096         261
         31-Dec-04    10.571    0.000        0     9.418    0.000           0

       Reserves at  31-Dec-99   1.104   mmbbls     0.983   mmbbls        net

      This evaluation has been supervised by Mr. J. R. Thompson, Head of
      Reserves Evaluations for PGS Reservoir Limited. Mr. Thompson has 31 years
      of varied petroleum and reservoir engineering experience. He has an MA in
      Natural Sciences, and is a Chartered Engineer. Other PGS employees
      involved in this work hold at least a bachelor degree (or its equivalent)
      in geology, geophysics, petroleum engineering or a related subject and
      have at least five years' relevant experience in the practice of geology,
      geophysics or petroleum engineering.

Basis of Opinion

       The evaluation presented in this letter reflects our informed judgements
       based on accepted standards of professional investigation, but is subject
       to generally recognised uncertainties associated with the interpretation
       of geological, geophysical and engineering data. The valuation has been
       conducted within our understanding of the effects of petroleum
       legislation, taxation, and other regulations that currently apply to the
       Camar Field. However, PGS is not in a position to attest to property
       title, financial interest relationships or encumbrances related to these
       properties.

<PAGE>

       It should be understood that any evaluation of hydrocarbon resources, is
       subject to government policies and market conditions prevailing at the
       time of the evaluation. Future changes can cause the total quantities of
       petroleum recovered to vary from those endorsed in this letter.

       Yours faithfully
       PGS Reservoir Limited.

       Jeremy R. Thompson M.A., C.Eng., M.I.M.M.
       Head of Reserves Evaluations

<PAGE>

Appendix 1: Definitions & Glossary

1) The following reserves definitions are used in this letter. These are
extracted from Rule 4-10(a) of Regulation S-X of the Securities Exchange act of
1934:

Proved Oil and Gas Reserves

Proved oil and gas reserves are the estimated quantities of crude oil, natural
g